By the Development Doc part, most design assumptions must be resolved and totally coordinated inputs are required to help the completion of detailed MEP/FP documentation. At this stage, the primary target shifts to finalizing system layouts, verifying equipment infrastructure, and producing information suitable for bidding, submitting, and construction. This